November Progress

The past month has been spent stripping out, removing wallpaper, preparing for the electrician and plasterer.

We have now had the house completely rewired to remove all the odd additions and patches the previous owner had made, and to upgrade the wiring and replace the switches and outlets. This will make it easier to reconfigure lighting and the new kitchen, if not just for peace of mind. It also gives us the opportunity to have the layout of switches, sockets, TV points exactly how we would like.

_MG_6491
Kitchen. Counter-top sockets in place and connections for appliances
_MG_6485
Pantry. We took the opportunity to install a light and socket
_MG_6489
Living Room
_MG_6490
Dining Room. There was a second consumer unit from the previous owner; we’ve removed both units and situated the replacement in the lobby to tidy things up

_MG_6488

_MG_6492
Bathroom stripped out
_MG_6494
One of the stripped out bedrooms
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s